Federal motorway A7

©DEGES/V-KON.media 

City: Schleswig-Holstein and Hamburg, Germany
Projecttype: Highway, infrastructure
Projectsize: 60 km motorway

The PPP project A7 includes the operation and maintenance of a 60 km routemotorway. Since 2017, 10 rest areas/parking lots, 10 connecting points, 8 rain retention basins, 72 bridges, 117 traffic sign bridges, 1 tunnel, 100 noise barriers and 30 retaining walls have been built on the route.In a higher-level management model, cross-project and standardized data from different data sources should be checked and evaluated, e.g. Data from the document management system or events from the implemented mobile processes for quality assurance.

As a part of the project A7, data from various authoring systems are linked into a common data integration platform. The data is visualized and analyzed using a 3D model and business intelligence software. A bidirectional connection of the 3D model and alphanumeric data supports the analysis of the data. ViCon uses a higher-level management model (3D BIS), which is standardized across projects in model building blocks and Project Breakdown Structure (PBS). Speed of modeling, quality assurance, transferability of use cases and cross-project benchmarks are advantages of this standardization.


©HOCHTIEF ViCon 


ViCon services
  • Design Management
  • Mobile forms for condition recording
  • Process-based defect management
  • Representation of ZEB driving, SIB structures
  • Maintenance management support

Further references |

Would you like to learn more?

Here you can find further interesting projects of HOCHTIEF ViCon

Overview
BIM Wiki |

What exactly is BIM?

Here you will find information about BIM.

Learn more
Career |

Discover your individual career opportunities. Here you can find information about HOCHTIEF ViCon as an attractive employer.

Learn more